净化处理通风管道的制做与安裝

发布人:   发布时间:2022-05-23 17:28:08

针对净化处理通风管道怎么制作与安装?下边由通风管道的技术工作人员介绍一下:

How to make and install the ventilation duct for purification treatment? The following is an introduction by the technical professional staff of the ventilation duct:

施工准备(包含机械设备、器材查验;队组施工工艺、技术交底;了解工程图纸等)→板才查验、工程验收→原材料清理、油渍→施工放样、开料→制做压槽(折方)清理压槽油渍→制做风管半成品加工→表面油渍脏物→铆合成形再清理风管内外表面→查验工程验收→封闭式支管→进库储放待装。

Construction preparation (including inspection of mechanical equipment and equipment; team construction process and safety technical disclosure; understanding of engineering drawings, etc.) → plate inspection and engineering acceptance → cleaning and eliminating oil stains of raw materials → construction setting out and cutting → making pressure groove (folding) and cleaning oil stains of pressure groove → making semi-finished products of air duct → eliminating oil stains and dirt on the surface → riveting and forming, and then cleaning the inner and outer surfaces of air duct → inspection and acceptance of Engineering → closed branch pipe → warehousing and storage for installation.

必中八码

施工准备→起吊制做(包含开料、矫直、成型、防锈处理刷油等)→当场起吊布局→半成品加工运到当场拼装间→风管拼装(包含清理达标的阀构件)→封闭式端口号测量穿管(再按制做工艺流程制做穿管)→运到当场拼装成封闭系统。

Construction preparation → hoisting and fabrication (including material cutting, straightening, forming, rust prevention treatment, oil painting, etc.) → hoisting and layout on the spot → processing and transporting semi-finished products to the on-site assembly room → air duct assembly (including valve components that meet the standard) → closed port number measurement and threading (and then making threading according to the manufacturing process) → transporting them to the on-site assembly room to form a closed system.

空调净化安装设备施工工序施工准备(包含了解工程图纸、队组技术交底、机器原材料提前准备等)→基本工程验收、进行复测、调整、解决→机器设备拆箱、核对、查验、工程验收→清洗机械→起重吊装、到位、地面找平、找正→机器设备穿管的制做、安装(按净化处理风管的制做、安装工艺流程开展)→机器设备试运行→设备带负载运作调节→工程验收。

Construction preparation for construction process of air conditioning purification installation equipment (including understanding engineering drawings, team safety technical disclosure, advance preparation of machine raw materials, etc.) → basic engineering acceptance, retesting, adjustment and solution → unpacking, checking, inspection and engineering acceptance of machinery and equipment → cleaning machinery → hoisting, in place, ground leveling and alignment → fabrication and installation of machinery and equipment through pipes Installation (according to the manufacturing and installation process flow of purification treatment air duct) → trial operation of machinery and equipment → adjustment of equipment with load operation → project acceptance.

本文的精彩内容由济南通风管道提供知识提供,本网站还有很多的精彩内容,更多的内容您可以点击进入:我们有专门的客服为您解答问题

The wonderful content of this article is provided by Jinan ventilation duct. There are many wonderful contents on this website. You can click to enter more contents: We have special customer service to answer your questions